1) Identification of the owner and the applicant.
2) Determine the purpose of the cadastral decision.
3) Enter the ownership document data.
4) Determine the secretariat, the municipality and the neighborhood.
5) Choosing the engineering office (surveyor classified) to do the surveying.
6) Choose a Classified Surveyor (Fast Track).
7) Send the application to the engineering office.
8) After paying the fees, the cadastral decision is issued and can be printed from the beneficiary's account.
1) Contracting with a cadastral classified engineering office.
2) The existence of an updated deed from the Ministry of Justice, a housing contract, or a title deed.
3) Pay the service fee.
4) Contracting with an accredited surveyor (in the case of the fast track).
Find out the list of requirements and government approvals required by type of activity.