Request coordination of multiple diggingies

  • Add to favourites
  • 0
    No votes submitted yet.

Request coordination of multiple diggingies

Infrastructure coordination services
A service provided to service entities at the level of the Kingdom, such as telecommunications, electricity and water companies, allowing those who represent them within the project coordination offices to apply for coordination of a group of excavations in a utility project within cities with the rest of the entities in preparation for the issuance of a later excavation permit for each excavation (pre-coordination excavation permit).
Request coordination of multiple diggingies

1) The office official counts the request for obtaining multiple excavation coordination after logging in to the Baladi platform, ensuring that all data is correct, reviewing the requirements, acknowledging their reading and compliance with them.
2) Coordination and accreditation bodies
3) Request a request to issue a report, coordinate multiple copies, and notify the applicant and issue a print report.

1) The service entity must define its representatives within the Infrastructure Projects Coordination Office (users are defined and powers are linked electronically).
2) The service entity must sign a service level agreement with the Ministry of Municipal, Rural Affairs and Housing.
3) The service entity shall prepare the geographical plans (Shape File) for the paths of all the excavations to be coordinated.
4) The service entity must prepare a security and safety plan at the site, and the plan must be compatible with the security and safety requirements contained in the Traffic Control Means Manual.
5) The service entity must prepare a traffic control plan in the event of the need to close a street, and the plan must be compatible with the traffic control manual issued by the Ministry of Municipal, Rural Affairs and Housing.
6) Sometimes the service body has to prepare an initial analysis of the expected impacts on the road.
7) The multi-coordination request must be submitted before the start of work in the nearest planned excavation, with sufficient time to allow the request to be published to all concerned parties and to coordinate between them.
8) The service entity submitting the application is obligated to review the application and approve the validity of its data before sending it.

Find out the list of requirements and government approvals required by type of activity.

View the executive instructions for the list of fines and penalties for municipal violations.

Log in to post comments
no comments
Facilities
Target audience
1 - 3 Days
Service duration
Submit electronically only through Balady portal, Mobile
Service channels
Service release date
Infrastructure coordination services
Product
Fees Calculator
Calculator
Service Cost
Service Cost

Payment Channels

Comments & suggestions

For any inquiries or comments on municipal services, please fill in the required information

send
Last update date: - Saudi Arabia
There are no ratings yet